Sensors & Transducers (Nov 2013)

Research on Temperature Field and Stress Field of Prefabricate Block Electric Furnace Roof

  • Wentao Xiao,
  • Gongfa Li,
  • Guozhang Jiang,
  • Jianyi Kong,
  • Jia Liu,
  • Shaoyang Shi,,
  • Yikun Zhang,
  • Fuwei Cheng,
  • Tao He

Journal volume & issue
Vol. 159, no. 11
pp. 74 – 79

Abstract

Read online

This paper establishes the CAD/CAE model of high aluminum brick furnace cover and a precast furnace cover (casting three block, eight block, twelve block) based on a 30t electric furnace roof real model of a steel factory and simulates the temperature and stress field of the firebrick roof and prefabricate block roof with ANSYS. The calculation results have indicated that the contact stress between furnace cover and precast block will affect the performance of the furnace cover and the furnace cover which is assembled by three pieces of casting precast block obtains lower stress levels has a longer service life, providing a quantitative reference for selection of casting scheme.

Keywords