هوش محاسباتی در مهندسی برق (Apr 2023)

Implementation of Hour-by-Hour Restoration Plan for Electrical Distribution Networks to improve Network Resiliency

  • Sasan Ghasemi,
  • Jamal Moshtagh,
  • Fateh Abdi

DOI
https://doi.org/10.22108/isee.2022.123070.1421
Journal volume & issue
Vol. 14, no. 1
pp. 59 – 74

Abstract

Read online

After extreme natural events like earthquakes, storms, and floods, the electrical distribution network may be isolated from the upstream grid. In such a situation, the electrical power of the upstream grid is lost and the available microgrids (MGs) are the only power sources. Since the power outputs of MGs are restricted, restoring all de-energized loads is impossible and restoring critical loads (CLs) becomes the most important concern of the distribution network operators. Therefore, in this paper, a new hour-by-hour restoration strategy for CLs restoration after a blackout is proposed. The desired objective functions include restored energy and switching operations. The proposed restoration strategy presents a restoration plan for each hour of the outage period. The efficiency of the proposed strategy is carried out on an IEEE 123-bus distribution network and the simulation results confirm the superiority of the proposed hour-by-hour restoration strategy over the other conventional restoration methods.

Keywords