Journal of Clinical and Translational Science (Jun 2017)
A multisite study of performance drivers among institutional review boards
Abstract
Introduction The time required to obtain Institutional Review Board (IRB) approval is a frequent subject of efforts to reduce unnecessary delays in initiating clinical trials. This study was conducted by and for IRB directors to better understand factors affecting approval times as a first step in developing a quality improvement framework. Methods 807 IRB-approved clinical trials from 5 University of California campuses were analyzed to identify operational and clinical trial characteristics influencing IRB approval times. Results High workloads, low staff ratios, limited training, and the number and types of ancillary reviews resulted in longer approval times. Biosafety reviews and the need for billing coverage analysis were ancillary reviews that contributed to the longest delays. Federally funded and multisite clinical trials had shorter approval times. Variability in between individual committees at each institution reviewing phase 3 multisite clinical trials also contributed to delays for some protocols. Accreditation was not associated with shorter approval times. Conclusions Reducing unnecessary delays in obtaining IRB approval will require a quality improvement framework that considers operational and study characteristics as well as the larger institutional regulatory environment.
Keywords