MATEC Web of Conferences (Jan 2019)

Floor defects in quarters over railway tunnel caused by design and construction errors

  • Majewski Tomasz,
  • Niedostatkiewicz Maciej,
  • Ziółkowski Patryk

DOI
https://doi.org/10.1051/matecconf/201928404005
Journal volume & issue
Vol. 284
p. 04005

Abstract

Read online

The main subject of this paper is a floor in the quarters located above the railway tunnel in the large-area Shopping Center. The considered floor did not meet the satisfactory safety conditions, as a result of design and construction errors, which were a direct cause of the failure. In the long term, failure could lead to a construction disaster.