International Journal of Mining and Geo-Engineering (Jun 2022)

Estimation of mining time-span to improve the solution time in long-term production planning

  • Mehdi Rahmanpour,
  • Morteza Osanloo,
  • S. M. Mahdi Mirabedi

DOI
https://doi.org/10.22059/ijmge.2021.313699.594876
Journal volume & issue
Vol. 56, no. 2
pp. 159 – 165

Abstract

Read online

Long-term production planning in open-pit mines is a precedence-constraint knapsack problem. A spatial representation of the mining region (called the block-model) is the primary input of mine planning models. One should note that as the number of blocks and periods to be planned increases, the number of decision variables increases. This paper presents a fast yet straightforward algorithm to reduce binary variables in open-pit mine production planning models. The algorithm considers mining capacity, processing capacity, and pit deepening rate to estimate the time span within which a block is mineable. This paper applies the algorithm in 12 different cases. The number of blocks varies from 1000 to 240000, and the mining periods range from 6 to 30 years. According to the results, this algorithm is helpful for problem size reduction.

Keywords