ntroduction. Metal reinforcement A-IIIв, manufactured from reinforcement A-III in accordance with GOST 5781 by pulling, was quite widely used for slabs of span structures of bridges in the period before 1991, as well as later. There is a need to repair such structures due to the exhaustion of their resource due to a significant duration of operation, damage due to the impact of means of destruction during hostilities. Often, the best option for repairing such spans is to replace a separate plate or plates with similar ones, since in this case there are no problems with the size of height, resting on existing supports, etc. Problem Statement. The vast majority of bridges in Ukraine, built in the period 1960-1991 and, to a large extent, in subsequent years, were designed according to typical projects. A large number of these bridges were built from girder slabs according to typical designs, where class A-IIIв reinforcement was used as prestressed reinforcement. These reinforcements were produced directly at the factories producing slabs structures from reinforcements of class A-III in accordance with GOST 5781 by pulling. To perform such works, the manufacturing plant must have appropriate equipment, qualified specialists, documentation, and obtain reinforcements of the required quality. As for the documentation, in the period up to 1991, such documentation was developed centrally and distributed to factories manufacturing structures. After 1991, this does not happen, the documentation is often not updated, which can be the reason for not ensuring the quality of the structures.

Keywords