Известия высших учебных заведений и энергетических объединенний СНГ: Энергетика (Jun 2005)
OPTIMIZATION OF DIAGRAMS ON USAGE OF POTENTIAL FUEL-GAS ENERGY OF CROSS-COUNTRY PIPE-LINES
Abstract
The paper considers a combined power installation being a part of gas expansion set and thermal engine for gas distribution stations. It is shown that in the case when a steam turbine condensing power plant serves as a substitution station increased heating of gas prior to GES without its cooling after the set is more profitable.