Risk analysis on implementation of road maintenance project with STEPLE method in Badung, Bali

  • Bagus Rai Adnyana Ida,
  • Ketut Sudarsana Dewa

DOI
https://doi.org/10.1051/matecconf/201927602012
Journal volume & issue
Vol. 276
p. 02012

Abstract

Read online

In the implementation of the road maintenance project always risks arise. These risks have an impact on stakeholders related to the execution of the project, the community of road users and the surrounding environment. These risks need to be studied, managed, and assessed as a risk-mitigation effort for stakeholders. As the case study is the district road maintenance project, in Badung regency of Bali. Descriptive method used in the study. Identification of variable risk used STEPLE (Social, Technology, Economy, Politics, Legal, and Environment) method. The factors STEPLE is identified through literature review and brainstorming, then used as a questionnaire instrument. Respondents are experts involved in road maintenance projects in Badung regency. Risk assessment uses a risk assessment matrix. The results of the study found 36 risks. These risks are identified as dominant from the Technical variable that is 13 risks. Risk assessment found is 6 risks classified as unacceptable, and 30 risk classified as undesirable.