Data (Apr 2018)
Comparison between Simulation and Analytical Methods in Reliability Data Analysis: A Case Study on Face Drilling Rigs
Abstract
Collecting the failure data and reliability analysis in an underground mining operation is challenging due to the harsh environment and high level of production pressure. Therefore, achieving an accurate, fast, and applicable analysis in a fleet of underground equipment is usually difficult and time consuming. This paper aims to discuss the main reliability analysis challenges in mining machinery by comparing three main approaches: two analytical methods (white-box and black-box modeling), and a simulation approach. For this purpose, the maintenance data from a fleet of face drilling rigs in a Swedish underground metal mine were extracted by the MAXIMO system over a period of two years and were applied for analysis. The investigations reveal that the performance of these approaches in ranking and the reliability of the studies of the machines is different. However, all mentioned methods provide similar outputs but, in general, the simulation estimates the reliability of the studied machines at a higher level. The simulation and white-box method sometimes provide exactly the same results, which are caused by their similar structure of analysis. On average, 9% of the data are missed in the white-box analysis due to a lack of sufficient data in some of the subsystems of the studies’ rigs.
Keywords