Scientific Reports (May 2024)
Research on process parameter optimization of irregular coal face
Abstract
Abstract Based on the engineering background of 1353 working face in Daizhuang Coalmine, the paper identifies three primary issues with the working face mining process: conventional pressure relief means are limited, risk of impact and the length of working face changes, It also proposes comprehensive control measures to improve the blasting roof cutting scheme, optimize mining speed and the location of the stopping line. The three improvement measures mentioned above are simulated numerically, and the effects of the drilling and blasting plan, mining speed, and stopping line location on stress distribution are determined. The results show that by implementing the three improvement measures, the stress variation interval can be efficiently controlled and the working face's production safety can be increased. Finally, it is determined that the 1353 working face of Daizhuang Coalmine adopts the pressure relief method of drilling on one side and cutting the roof 20 m deep on the other side, and the mining speed of the working face is 3 m/day and the length of the stopping line is 85 m. Based on the on-site monitoring results, the implementation of comprehensive treatment measures can effectively improve the surrounding rock state of 1353 working face, which has certain guiding significance for the mining of irregular working face.
Keywords