Membranes (Nov 2018)

Treatment of Flue Gas Desulfurization Wastewater by an Integrated Membrane-Based Process for Approaching Zero Liquid Discharge

  • Carmela Conidi,
  • Francesca Macedonio,
  • Aamer Ali,
  • Alfredo Cassano,
  • Alessandra Criscuoli,
  • Pietro Argurio,
  • Enrico Drioli

DOI
https://doi.org/10.3390/membranes8040117
Journal volume & issue
Vol. 8, no. 4
p. 117

Abstract

Read online

An integrated membrane process for the treatment of wastewaters from a flue gas desulfurization (FGD) plant was implemented on a laboratory scale to reduce their salt content and to produce a water stream to be recycled in the power industry. The process is based on a preliminary pretreatment of FGD wastewaters, which includes chemical softening and ultrafiltration (UF) to remove Ca2+ and Mg2+ ions as well as organic compounds. The pretreated wastewaters were submitted to a reverse osmosis (RO) step to separate salts from water. The RO retentate was finally submitted to a membrane distillation (MD) step to extract more water, thus increasing the total water recovery factor while producing a high-purity permeate stream. The performance of RO and MD membranes was evaluated by calculating salts rejection, permeate flux, fouling index, and water recovery. The investigated integrated system allowed a total recovery factor of about 94% to be reached, with a consequent reduction of the volume of FGD wastewater to be disposed, and an MD permeate stream with an electrical conductivity of 80 μS/cm, able to be reused in the power plant, with a saving in fresh water demand.

Keywords