Glasnik Šumarskog Fakulteta: Univerzitet u Beogradu (Jan 2006)
Flexibility of production systems and prepare-finish time
Abstract
One of the specificities of the large-serial and mass production is the almost neglected percentage of prepare-finish time in the production cycle. In the conditions of today dominant discontinuous production, it becomes a significant element of the production cycle. The eastern (Japan) doctrine of increasing the flexibility of the production systems, is based inter alia also on the extreme reduction of the prepare-finish time. For this reason, the aim of this study was to identify the types and percentages of individual jobs within the group of prepare-finish jobs. The sample consisted of 3 (three) production systems for the production of joinery, with the discontinuous production system. The research shows that the percentage of time of the jobs installation of work instruments, regulation of processing regime, and removal of work instruments is extremely long and that it ranges between 11.83% and 18.93% of the shift time. The reasons of the high percentage of these jobs are the wide range of products and the absence of the rationalisation of prepare-finish jobs. Within the efforts to minimize the effects of disruption and to increase the flexibility of the production systems, the rationalisation of prepare-finish jobs is the unavoidable condition.
Keywords