Nauka ta progres transportu (Jul 2009)

THE GAUGE MODEL DEVELOPMENT FOR SIMULATION OF MINING PROCESSES

  • D. M. Kozachenko

Journal volume & issue
Vol. 29
pp. 54 – 58

Abstract

Read online

A model structure of track lay-out for simulation of the process of braking-up and making up of freight trains on the sorting humps is presented. The model is made on the basis of weighed directed graphs. The longitudinal hump profile is approximated by a cubic spline.

Keywords