E3S Web of Conferences (Jan 2020)

Analysis of suspension bridge tunnel-type anchorage construction on the stability of surrounding rock

  • Li Nana,
  • Zhou Yongqiang,
  • Zhao Yanqiang,
  • Li Guiju

DOI
https://doi.org/10.1051/e3sconf/202019802006
Journal volume & issue
Vol. 198
p. 02006

Abstract

Read online

In order to study the interaction between the left and right tunnels of suspension bridge tunnel-type anchorage, the finite difference numerical software is used to analyze the mechanical properties of the surrounding rock during the construction process. A numerical analysis model based on FLAC3D is established to analyze the stress, displacement and plastic zone changes of the surrounding rock of right tunnel anchor cavern during the construction of left tunnel anchor cavern. The right tunnel anchor cavern is excavated firstly, and then the left tunnel anchor cavern is excavated. The numerical simulation results show that the main displacement of the right tunnel occurs in the construction stage of the anchor plug body and the rear anchor cavern of the left tunnel. During the excavation of the left tunnel, the plastic zones of the left and right tunnel anchor caverns are only connected above the middle of the waist wall. Therefore, it is suggested that during the construction process, especially in the excavation stage of the anchor plug body and the rear anchor cavern, the area above the middle of the tunnel waist wall should be strengthened in time to ensure the construction safety.