Designs (Nov 2023)

Field Experiment for a Prequalification Scheme for a Distribution System Operator on Distributed Energy Resource Aggregations

  • Jung-Sung Park,
  • Bal-Ho Kim

DOI
https://doi.org/10.3390/designs7060134
Journal volume & issue
Vol. 7, no. 6
p. 134

Abstract

Read online

The purpose of this paper is to summarize and share the field experiment results of KEPCO’s project consortium to create a TSO-DSO-DERA interaction scheme. The field experiment was conducted based on the prequalification algorithm proposed in previous research from the same consortium, and was designed to verify the validity of the algorithm under realistic grid conditions. In addition, during the course of the field experiment, it was found that points that were missed or not given much importance in the existing prequalification algorithm could affect the completeness of the overall system, and then practical improvements were made to improve this. The demonstration results confirm that the proposed algorithm is effective in real-world grid environments and can help DSOs to ensure the reliability of the distribution system while supporting DERA’s participation in the wholesale market using the proposed prequalification scheme.

Keywords