E3S Web of Conferences (Jan 2021)
Economic assessment of a complex of measures for the remediation of the territory from technogenic impact
Abstract
In this work, an economic assessment of environmental damage to water and land resources is calculated, and the cost of a project for the reclamation of destroyed lands within the territory of the Komsomolsk gold recovery plant is determined. The object of the study is directly the territory of the enterprise, which is located in the Tisulsky municipal district of the Kemerovo region. According to our calculations, the total assessment of environmental damage from the plant’s activities amounted to 458 million rubles, of which: 294 million rubles – accumulated environmental damage from water pollution; 164 million rubles – accumulated environmental damage from soil pollution in the surrounding area. The cost estimate of the destroyed land reclamation project amounted to 716.7 million rubles. At the same time, income from the sale of equipment and gold mined in the territory of the tailing dump reaches 3916 million rubles.