Parasites & Vectors (May 2019)

Barriers to the National Onchocerciasis Control Programme at operational level in Cameroon: a qualitative assessment of stakeholders’ views

  • Fanny Nadia Dissak-Delon,
  • Guy-Roger Kamga,
  • Perrine Claire Humblet,
  • Annie Robert,
  • Jacob Souopgui,
  • Joseph Kamgno,
  • Stephen Mbigha Ghogomu,
  • Isabelle Godin

DOI
https://doi.org/10.1186/s13071-019-3497-5
Journal volume & issue
Vol. 12, no. 1
pp. 1 – 12

Abstract

Read online

Abstract Background The global burden of onchocerciasis is the heaviest in sub-Saharan Africa. Studies have shown the importance of the role of Community-Directed Distributors (CDDs) and nurses in onchocerciasis control, but little is known about their experience in implementing onchocerciasis control programmes. Our aim was to document the barriers that CDDs and local health administrators face in implementing onchocerciasis control activities. Methods We conducted a qualitative survey consisting of 16 in-depth interviews and 8 focus group discussions (FGDs) across three health districts of Cameroon. We interviewed a total of 9 local health officials at the district and Health Area levels, and 7 CDDs. Eight FGDs were conducted with CDDs and Health Committee members. Results The major barriers to the implementation of Community Directed Treatment with Ivermectin that we identified were linked and interrelated. Examples of these barriers included: contextual factors (geographical and cultural background), top-to-bottom planning, insufficient human and material resources, and lack of transparency in the management of the programme’s funds. Conclusions The CDTI at operational level still faces many obstacles which negatively affect therapeutic coverages. This can lead to the non-adhesion of the communities to the programme, consequently jeopardizing the sustainability of the onchocerciasis elimination programme. We recommend that the national programme planners put in place a transparent management and planning system for onchocerciasis elimination activities, with better communication with local programme stakeholders.

Keywords