IEEE Access (Jan 2018)

Blocking Flowshop Scheduling Model for Optimising Cubic Criterion With Release Dates

  • Tao Ren,
  • Jie Liang,
  • Yi-Yang Liu,
  • Yao Fu,
  • Xiao-Zhi Cui,
  • Qi-Bo Hu

DOI
https://doi.org/10.1109/ACCESS.2018.2881960
Journal volume & issue
Vol. 6
pp. 72179 – 72188

Abstract

Read online

Blocking phenomenon occurs in a flowshop that has a limited buffer between any two successive machines. Once the buffer is full, the upstream machine is forbidden to release a finished job. The job has to remain on the machine until the buffer can accommodate it. This study investigates a blocking flowshop scheduling problem, in which each job has its own release date, with the optimal criterion of minimizing the total cubic completion time. Given that the problem is NP-hard, a metaheuristic algorithm can efficiently achieve a near-optimal solution within a due time. On the basis of the properties of job sequencing, simulated annealing, tabu search, and genetic algorithm are presented to obtain high-quality solutions for medium-scale problems. A series of random experiments are conducted to show the effectiveness of the proposed algorithms.

Keywords