On the optimization of the construction of ventilation systems during the construction of metro by underground method

  • Vartanov Alexander,
  • Markova Irina,
  • Fedash Anatoly

DOI
https://doi.org/10.1051/matecconf/201926505028
Journal volume & issue
Vol. 265
p. 05028

Abstract

Read online

The article discusses optimal versions for placement of ventilation systems for deep-laid underground lines, performed in a closed way, with the removal of the ventilation chamber from the ventilation output and placing it either in the ventilation shaft or in a specially constructed ventilation chamber located near the trunk, which significantly simplifies the design of excavation, and as a result, speed up its construction. To reduce the construction time, it is proposed to perform parallel work on the vent development and the ventilation chamber, including the possible installation of process equipment in parallel with the mining operations during the construction of the metro by the underground method.