Applied Sciences (Mar 2017)

Researching a Fuzzy- and Performance-Based Optimization Method for the Life-Cycle Cost of SRHPC Frame Structures

  • Jie Zheng,
  • Li-guo Dong,
  • Shan-suo Zheng,
  • Lei Zeng,
  • Ze-hui Xiang,
  • Wei He

DOI
https://doi.org/10.3390/app7030269
Journal volume & issue
Vol. 7, no. 3
p. 269

Abstract

Read online

In order to solve two problems with the traditional optimization method of steel reinforced high strength high performance concrete (SRHPC) frame structures, a fuzzy mathematics and performance-based optimization method for the life-cycle cost of SRHPC frame structures is proposed. In the optimization program, quantitative seismic performance indicators of SRHPC frame structures are determined according to the experimental results of SRHPC columns. Furthermore, by considering the fuzzy reliability of structures under each performance level, the life-cycle optimization model of SRHPC frame structures can be established. In order to solve the problem of too many variables and constraints in the optimization process, a two-step optimization method is proposed. Finally, an optimization example is carried out through the MATLAB program to demonstrate the feasibility of this model.

Keywords