E3S Web of Conferences (Jan 2019)

Analysis of Longwall Salvage Operations in JSC SUEK-Kuzbass Underground Mines

  • Yermakova Inna,
  • Fedusov Vyacheslav

DOI
https://doi.org/10.1051/e3sconf/201910501049
Journal volume & issue
Vol. 105
p. 01049

Abstract

Read online

The longwall coal mining method is the most productive mining method. However, the salvage operations which include the formation of the salvage chamber and the salvage of longwall face equipment require improvement. In 2011-2017, the time spent for salvage operations in SUEK-Kuzbass mines exceeded the standard time by more than 900 days. It has been established that the longwall face width from 230 to 300 m has no effect on the duration of salvage operations.