Journal of Industrial Engineering and Management (Jan 2015)

Resource scheduling of workflow multi-instance migration based on the shuffled leapfrog algorithm

  • Yang Mingshun,
  • Gao Xinqin,
  • Cao Yuan,
  • Liu Yong,
  • Li Yan

DOI
https://doi.org/10.3926/jiem.1363
Journal volume & issue
Vol. 8, no. 1
pp. 217 – 232

Abstract

Read online

Purpose: When the workflow changed, resource scheduling optimization in the process of the current running instance migration has become a hot issue in current workflow flexible research; purpose of the article is to investigate the resource scheduling problem of workflow multi-instance migration. Design/methodology/approach: The time and cost relationships between activities and resources in workflow instance migration process are analyzed and a resource scheduling optimization model in the process of workflow instance migration is set up; Research is performed on resource scheduling optimization in workflow multi-instance migration, leapfrog algorithm is adopted to obtain the optimal resource scheduling scheme. An example is given to verify the validity of the model and the algorithm. Findings: under the constraints of resource cost and quantity, an optimal resource scheduling scheme for workflow migration is found, ensuring a minimal running time and optimal cost.

Keywords