Geothermal Energy (Mar 2020)

Reconstruction of geothermal boreholes in Poland

  • Wiesław Bujakowski,
  • Bogusław Bielec,
  • Maciej Miecznik,
  • Leszek Pająk

DOI
https://doi.org/10.1186/s40517-020-00164-x
Journal volume & issue
Vol. 8, no. 1
pp. 1 – 27

Abstract

Read online

Abstract The beginnings of geothermal implementation research in Poland date back to 1989–1993 when the Mineral and Energy Economy Research Institute of the Polish Academy of Sciences (MEERI PAS) launched the first geothermal installation in the Podhale region, using the reconstructed Bańska IG-1 well. The knowledge acquired during these 30 years has highlighted the importance of geothermal energy—among other things, borehole reconstruction operations and the need for their further refinement. The technologies developed have been used in virtually all geothermal heating systems operating in Poland. Examples of successful reconstruction work include the Bańska IG-1 and Biały Dunajec PAN-1 wells operated by the PEC Geotermia Podhalańska S.A. geothermal company. The Mszczonów IG-1 well, which is operated by the Geotermia Mazowiecka S.A. heating company, has also undergone considerable work almost 24 years after its complete closure. Reconstruction processes can also be important in adapting existing wells for geothermal purposes. After World War II, more than 8000 boreholes deeper than 1000 m were drilled in Poland. They were primarily made for the purpose of geological surveys and hydrocarbon exploration. Some of these boreholes can be adapted for operation in geothermal systems. The paper presents selected methods of reconstructing abandoned, disused (not abandoned and not decommissioned) or damaged boreholes in order to use them in the geothermal water extraction process. Four examples of borehole reconstruction, designed and carried out with the participation of MEERI PAS in Kraków, are discussed in more detail.

Keywords