Zbornik Radova: Elektrotehnički Institut "Nikola Tesla" (Jan 2015)

Verification of turbine and governor model of hydro generator unit for the purpose of load frequency control system simulation

  • Džepčeski Dane,
  • Georgijević Nikola,
  • Pavlović Jelena,
  • Arnautović Dušan,
  • Lukić Sanja,
  • Stanojčić Vladimir,
  • Bogdanović Slobodan,
  • Trišić Dušan,
  • Jovanović Boris,
  • Latinović Aleksandar

DOI
https://doi.org/10.5937/zeint25-9401
Journal volume & issue
Vol. 2015, no. 25
pp. 145 – 153

Abstract

Read online

In this paper, verification of power plant component models is performed by evaluating the deviations between simulation results and test results of the component under study. The obtained deviations of the simulation results from the test results, as well as the acceptability of its value for a particular model and purpose, are determined in the process of verification. In this paper, the test results, the model and the verification procedure are presented. The basis for the model synthesis and verification are the test results derived from measurements conducted with the aim of deriving the operational performance of hydro unit R2 in PSP 'Bajina Bašta' connected to the load frequency control system.

Keywords