MATEC Web of Conferences (Jan 2019)

About the need of carrying out researches of wear resistance of groups of mating parts for ensuring anticipatory scheduling of repair influences

  • Ivanova Tatyana,
  • Revenko Nikolay,
  • Silivanova Olga

DOI
https://doi.org/10.1051/matecconf/201929800114
Journal volume & issue
Vol. 298
p. 00114

Abstract

Read online

The article shows the role of scientifically substantiated system of planning as the function of management of technical maintenance and repair of the equipment on the basis of the analysis of the factors influencing durability of operation of processing equipment of the industrial enterprises. It is shown that the use of system of fixed-schedule maintenance allows: to prepare the controllable and predictable over a long time period repair program according to the types of repair, the types of equipment , the workshops and the whole enterprise; to predict material, financial and labor resources, necessary capital investments in development of production base of repair service; to carry out preliminary preparation of repair work, to carry out them in the minimum terms; it increases the quality of repair and, finally, increases the reliability of the equipment.