Nauka ta progres transportu (Mar 2010)

TESTING OF REINFORCED CONCRETE GIRDERS WITH LENGTH ABOUT 55 M WITH USING INNOVATIVE MEASURING EQUIPMENTS

  • H. P. Pastushkov,
  • V. H. Pastushkov,
  • V. A. Bilyi,
  • A. A. Yakovlev

Journal volume & issue
Vol. 33
pp. 191 – 192

Abstract

Read online

The results of test of the steel-ferro-concrete span, manufactured according to a specific project at Chekhov Plant of Bridge Constructions (Russia), are presented in the article.

Keywords