MATEC Web of Conferences (Jan 2018)
Modeling of construction process scheduling with Time Coupling Methods
Abstract
The topic of the paper is referred to optimization model for multiobjective solutions for construction management. It is known in literature as Time Coupling Methods (TCM). It presents another approach to scheduling methods from known methods like LSM, CPM/PERT, LOC, RSM. TCM is based on couplings that bounds activities in technology and management. The new modifications to TCM will be presented that add flexibility when dealing with complex civil engineering problems.