Clinical Medicine Insights: Oncology (Jun 2019)

Improvement of Chemotherapy Solutions Production Procedure in a Hospital Central Chemotherapy Preparation Unit: A Systematic Risk Assessment to Prevent Avoidable Harm in Cancer Patients

  • Klio Bourika,
  • Angelos Koutras,
  • Haralambos Kalofonos,
  • Anna Vicha,
  • Ekaterini Tsiata,
  • Evangelia Papadimitriou,
  • Konstantinos Avgoustakis,
  • Zoi Panagi

DOI
https://doi.org/10.1177/1179554919852933
Journal volume & issue
Vol. 13

Abstract

Read online

Objective: This study was designed to reevaluate and improve the quality and safety of the chemotherapy preparation in a Central Chemotherapy Preparation Unit of a Public Hospital. Methods: A failure modes, effects, and criticality analysis (FMECA) was conducted by a multidisciplinary team. All potential failure modes at each stage of the chemotherapy preparation were recorded, and the associated risks were scored for their severity, occurrence, and detectability with a risk priority number (RPN). Corrective actions were suggested, and new RPNs were estimated for the modified process. Results: Failure modes, effects, and criticality analysis and priority matrix construction, revealed that the partial compliance of Unit’s premises with international standards (RPN stage : 307), the human errors throughout the compounding (RPN stage : 223)—labeling (RPN stage : 216)—prescribing (RPN stage : 198) steps, and the violation of working protocols by employees (RPN stage : 215), were the most important risks for which either urgent or immediate corrective actions had to be taken. Modifying the procedure through the proposed corrective actions is expected to lead to a significant (71.3%) risk containment, with a total RPN preparation process reduction from 2102 to 604. Conclusions: Failure modes, effects, and criticality analysis and priority matrix development identified and prioritized effectively the risks associated with chemotherapy preparation allowing for the improvement of health services to cancer patients.