Jurnal Nasional Teknik Elektro (Mar 2014)

Analisa Pengaruh Integrasi Pembangkit Tersebar dalam Sistem Komposit

  • Syafii.,
  • Syukri Yunus,
  • Asrizal

Journal volume & issue
Vol. 3, no. 1
pp. 95 – 105

Abstract

Read online

Electricity demand in Indonesia continues to increase in accordance with the development of science and technology. Therefore, there is a need of reliable power system, qualified , and able to meet all electricity needs. To optimize the reliability of the power system work one is to perform the installation of distributed generation on power composite system. With the installation of distributed generation power loss and voltage drop that occurs can be reduced. In the installation of distributed generation is a lot of things to consider, such as the exact mounting position, the amount of distributed generation, distributed generation large capacity and type of distributed generation technology used. Based on the research results position the optimal placement of distributed generation is located close to the load. The total power loss and transmission systems combined distribution system after the addition of distributed generation has been decreased and voltage profile increased. The losses and voltage drop values vary based on the variation of distributed generation technologies.

Keywords