Shock and Vibration (Jan 2024)

Retracted: Parallel-Machine Scheduling with DeJong’s Learning Effect, Delivery Times, Rate-Modifying Activity, and Resource Allocation

  • Shock and Vibration

DOI
https://doi.org/10.1155/2024/9872819
Journal volume & issue
Vol. 2024

Abstract

Read online

No abstracts available.