SHS Web of Conferences (Jan 2021)
Method of System Optimization of Mobile Formations Activity
Abstract
The distinctive features of mobile construction units operating at a considerable distance from the places of permanent residence of workers and the location of construction organizations have been considered. For their effective activity, a high level of synchronization of the stages of preparation of a construction organization and their formations, preparation for the construction of the facilities, delivery of labor and material and technical resources, production of pioneer, preparatory and construction and installation works is required. A method has been proposed that includes the definition of a system of indicators for regulating the parameters of the above stages for compliance with the design solutions. The system of indicators makes it possible to assess not only the level of mobility of construction units and the means of their technical equipment, but also to express the actual intensity of work through the concentration of the resources. As a result, it becomes possible to compare the actual and design intensities of work with the subsequent development of appropriate measures in advance, taking into account the conditions of hard-to-reach and sparsely populated areas of pioneering development of the territories. At the same time, such measures, as studies have shown, include the use, as a rule, of only existing resources on the spot without attracting additional ones from outside.