E3S Web of Conferences (Jan 2024)

The formation of output capacity of industrial housing construction enterprises

  • Spirin Alexander

DOI
https://doi.org/10.1051/e3sconf/202453501014
Journal volume & issue
Vol. 535
p. 01014

Abstract

Read online

The productivity of industrial housing construction enterprise (IHCE) is determined by its output capacity, reflecting the volume of construction products realized by it for a period. The output capacity of IHCE is based on its potential - the totality of all the resources available to the enterprise, which can be used by it in economic activity. Under the influence of various factors, the potential of IHCE is transformed into its input capacity. Input capacity reflects the maximum volume of construction products that IHCE can produce over a period. Being limited by the resource base, the input capacity of the enterprise is transformed into the resource capacity. Due to low workload, unfavorable probabilistic events and reasons related to economic management, there are losses of resource capacity, and the remaining part of it represents the output capacity. To increase the output capacity of the enterprise it is advisable to resort to the process method - based on the stages of the product life cycle of industrial housing construction enterprises to make a system of interrelated processes and consider the output capacity of each of them.

Keywords