Energies (Sep 2021)

Techno-Economic Feasibility of the Longwall Top Coal Caving Method Based on the FTCD Index: A Parametric Case Study in India

  • Nasina Balasubrahmanyam,
  • Gnananandh Budi

DOI
https://doi.org/10.3390/en14196115
Journal volume & issue
Vol. 14, no. 19
p. 6115

Abstract

Read online

An extraction method for deep-seated thick seam deposits by underground mining with high resource recovery has remained a great challenge for Indian mining engineers, whereas the longwall top coal caving (LTCC) method has evolved as an effective method for various geo mining conditions in China and other counties. The percentage of top coal recovery (TCR) plays a predominant role in determining the feasibility of LTCC, which relies on the First Top Coal Caving Distance (FTCD). In this paper, the critical geotechnical parameters are identified, numerically simulated, and statistically analyzed, and the FTCD for Indian geo-mining conditions is developed and validated. A financial assessment is conducted, considering 70% top coal recovery at 85% performance level, cost of production escalated by 20% and fall in coal grade by two grades. The internal rate of return (IRR) for LTCC is 30.24% as per the sensitivity analysis where it is only 18% in single pass longwall method. This study contributes to evaluating both the technical and economic feasibility of introducing LTCC in Indian geo-mining conditions.

Keywords