Вестник СибАДИ (Aug 2017)

IMPROVEMENT OF BOARDWALK NAILED – SPAN BRIDGE STRUCTURES

  • V. A. Utkin,
  • P. N. Kobzev

DOI
https://doi.org/10.26518/2071-7296-2017-1(53)-115-121
Journal volume & issue
Vol. 0, no. 1(53)
pp. 115 – 121

Abstract

Read online

The article is devoted to the implementation in practice of the construction of the new bridge boardwalk timber - nail span structures that meet the modern requirements of load capacity, reliability and durability. The authors propose and describe a new design of the span timber-beam-peg–nailed blocks with longitudinal-transverse orientation of the belt boards and carrying transverse reinforced concrete slab of the carriageway. The represented materials show the effectiveness of the proposed solutions.

Keywords