Zbornik Radova: Elektrotehnički Institut "Nikola Tesla" (Jan 2011)

Tests of work quality of power unit C in HPP 'Potpeć' in load-frequency control

  • Džepčeski Dane,
  • Bogdanović Slobodan,
  • Arnautović Dušan,
  • Pavlović Jelena,
  • Dragosavac Jasna

DOI
https://doi.org/10.5937/zreint1121211D
Journal volume & issue
Vol. 2011, no. 21
pp. 211 – 221

Abstract

Read online

In this paper numerous results of tests of turbine governing system on power unit C in HPP 'Potpeć' are presented. Tests were performed for the purpose of checking the quality of participation of this hydro power unit in load-frequency control in the power system of Serbia. Also, experimental determination of the relevant parameters of turbine governor for making of mathematical model of the turbine governer and hydro power unit as the elements of power system were performed.

Keywords