Scientific Reports (Jun 2024)

Support mechanical response analysis and surrounding rock pressure calculation method for a shallow buried super large section tunnel in weak surrounding rock

  • Haixiang Lai,
  • Xiuying Wang,
  • Zhongsheng Tan,
  • Jinpeng Zhao,
  • Xiabing Liu

DOI
https://doi.org/10.1038/s41598-024-64522-6
Journal volume & issue
Vol. 14, no. 1
pp. 1 – 17

Abstract

Read online

Abstract At present, China's demand for high-speed railway construction is constantly increasing, and the construction of Multi line high-speed railway tunnels has been put on the agenda. The design and construction issues of super-large-sections tunnels urgently need to be addressed. The Xiabei mountain No. 1 and No. 2 tunnels in the Hangzhou-Taizhou Railway are typical shallow-buried super-large-section-tunnels in weak surrounding rock, and their design and construction issues are representative. Eleven monitoring sections were set up in the tunnel, including tunnel deformation, surrounding rock, shotcrete, steel frames, bolts and temporary support mechanical responses. Taking the monitoring data of the most typical cross-section as an example, the mechanical response of the support structure of a shallow-buried super-large-section tunnel was analyzed in detail. Based on previous research results, this paper discusses and summarizes the common construction problems of this type of tunnel, and puts forward corresponding suggestions. The existing formula for calculating surrounding rock pressure has poor applicability to super-large-section tunnels constructed by step excavation, resulting in conservative support parameters. Therefore, based on the monitoring values of surrounding rock pressure at 10 monitoring sections in Xiabei mountain No. 1 and No. 2 tunnels, empirical parameters reflecting the impact of step excavation were summarized. Based on the Wang formula and combined with the step excavation empirical parameters, an empirical formula for the surrounding rock pressure of shallow-buried super-large-section tunnels considering step excavation was constructed. The calculated results are in good agreement with the on-site monitoring data. This study can provide a good reference for similar projects.

Keywords