International Journal of Naval Architecture and Ocean Engineering (Jul 2016)

Research on scheduling and optimization under uncertain conditions in panel block production line in shipbuilding

  • Chong Wang,
  • Puxiu Mao,
  • Yunsheng Mao,
  • Jong Gye Shin

DOI
https://doi.org/10.1016/j.ijnaoe.2016.03.009
Journal volume & issue
Vol. 8, no. 4
pp. 398 – 408

Abstract

Read online

Based on non-completely hybrid flow line scheduling of panel block in shipbuilding, several uncertain factors influencing the problem were analyzed in a real environment, and a nonlinear integer programming model was built for each sub-scheduling problem. To narrow the difference between theory and application, rolling horizon and rescheduling methods are proposed. Moreover, with respect to the uncertainty of processing time, arriving time and due time, we take the minimizing of the early and delayed delivery costs as the objective, and establish an evaluation with a global penalty function. Finally, numerical experiments and a simulation analysis were undertaken to demonstrate the effectiveness of the model and algorithm.

Keywords