Journal of Water and Land Development (Jul 2014)
The Prognosis of Influence of The Oder River Waters Dammed by Malczyce Barrage on Left Bank Areas
Abstract
The finalisation of the construction of the Malczyce barrage is planned for 2015. Damming of the river will cause a change in the water and ground conditions in the adjoining areas. The paper analyses the influence of the water level in the Oder River dammed by the barrage on groundwater table level in the left bank valley.
Keywords