Hemijska Industrija (Jan 2003)

Wet hydrate dissolution plant

  • Stanković Mirjana S.,
  • Kovačević Branimir T.,
  • Pezo Lato L.

DOI
https://doi.org/10.2298/HEMIND0302061S
Journal volume & issue
Vol. 57, no. 2
pp. 61 – 63

Abstract

Read online

The IGPC Engineering Department designed basic projects for a wet hydrate dissolution plant, using technology developed in the IGPC laboratories. Several projects were completed: technological, machine, electrical, automation. On the basis of these projects, a production plant with capacity of 50,000 t/y was manufactured, at "Zeolite Mira", Mira (VE), Italy, in 1997, for increasing detergent zeolite production from 50,000 to 100,000 t/y. Several goals were realized by designing a wet hydrate dissolution plant. Main goal was increasing the detergent zeolite production capacity. The technological cycle of NaOH was closed, and no effluents emitted, and there is no pollution. Wet hydrate dissolution is now fully continuous, which is important for maintaining zeolite production quality, as well as for simplifying production. The wet hydrate production process is fully automatized, and the product has uniform quality. The production process can be controlled manually, which is necessary during start-up, and repairs. By installing additional process equipment (centrifugal pumps and dissolving reactors) technological bottlenecks were overcome, and by adjusting NaOH tanks and dissolving reactors, the capacities of the process equipment was fully utilized.

Keywords