Budownictwo o Zoptymalizowanym Potencjale Energetycznym (Dec 2024)

Effect of using building information modelling on different phases of the project lifecycle

  • Anees Ahmed Vighio,
  • Allah Nawaz Girano,
  • Neardey Monh

DOI
https://doi.org/10.17512/bozpe.2024.13.22
Journal volume & issue
Vol. 13
pp. 218 – 228

Abstract

Read online

The construction sector in emerging nations like Pakistan faces challenges due to the limited use of advanced technology. Building Information Modeling (BIM) offers key benefits, including cost savings, reduced rework, and early detection of design faults. BIM also manages large amounts of data by integrating information from various phases of the project life-cycle. This study examines BIM’s impact on planning, design, and construction phases through a survey of 40 field experts, ranked using the Likert scale. Results show that BIM enhances collaboration, supports better design pathways, and assists project managers during planning. In design, it improves information sharing, efficiency, and scheduling. Dur-ing construction, BIM facilitates seamless information flow, visualized model execution, and effective risk management. The findings highlight BIM’s potential to address lifecycle chal-lenges and improve overall project outcomes.

Keywords