Complex System Modeling and Simulation (Jun 2024)

Hierarchical Disturbance Propagation Mechanism and Improved Contract Net Protocol for Satellite TT&C Resource Dynamic Scheduling

  • Zhiqing Xiang,
  • Yi Gu,
  • Xinwei Wang,
  • Guohua Wu

DOI
https://doi.org/10.23919/CSMS.2024.0004
Journal volume & issue
Vol. 4, no. 2
pp. 166 – 183

Abstract

Read online

The practical engineering of satellite tracking telemetry and command (TT&C) is often disturbed by unpredictable external factors, including the temporary rise in a significant quantity of satellite TT&C tasks, temporary failures and failures of some TT&C resources, and so on. To improve the adaptability and robustness of satellite TT&C systems when faced with uncertain dynamic disturbances, a hierarchical disturbance propagation mechanism and an improved contract network dynamic scheduling method for satellite TT&C resources were designed to address the dynamic scheduling problem of satellite TT&C resources. Firstly, the characteristics of the dynamic scheduling problem of satellite TT&C resources are analyzed, and a mathematical model is established with the weighted optimization objectives of maximizing the revenue from task completion and minimizing the degree of plan disturbance. Then, a bottom-up distributed dynamic collaborative scheduling framework for satellite TT&C resources is proposed, which includes a task layer, a resource layer, a central internal collaboration layer, and a central external collaboration layer. Dynamic disturbances are propagated layer by layer from the task layer to the central external collaboration layer in a bottom-up manner, using efficient heuristic strategies in the task layer and the resource layer, respectively. We use improved contract network algorithms in the center internal collaboration layer and the center external collaboration layer, the original scheduling plan is quickly adjusted to minimize the impact of disturbances while effectively completing dynamic task requirements. Finally, a large number of simulation experiments were carried out and compared with various comparative algorithms. The results show that the proposed algorithm can effectively improve the solution effect of satellite TT&C resource dynamic scheduling problems, and has good application prospects.

Keywords