Litʹë i Metallurgiâ (Sep 2011)

FORMATION OF PLAN COST OF READY PRODUCTS OF STEEL PRODUCTION RUP «BMZ» BY MEANS OF MODULE CONTROLLING OF SYSTEM SAP R/3

  • S. N. Astratov

DOI
https://doi.org/10.21122/1683-6065-2011-3-202-206
Journal volume & issue
Vol. 0, no. 3
pp. 202 – 206

Abstract

Read online

It is shown that formation of the planned cost price of finished goods of steel production of RUP«BMZ»by mean of the module of controlling system SAPR/3 – one of the most effective administrative tools at the current stage of market relations.