Rekayasa Sipil (Jun 2024)

The Use of Source Validation Protocol Approach to Delay Investigation Analysis of Construction Project Realization

  • Via Dolorosa Gea,
  • Adwitya Bhaskara,
  • Puspita Ambartiyas

DOI
https://doi.org/10.21776/ub.rekayasasipil.2024.018.02.13
Journal volume & issue
Vol. 18, no. 2
pp. 159 – 164

Abstract

Read online

Delays in construction projects are common and persistent. Frequent disputes also make work time inefficient and result in significant cost increases. Therefore, it is necessary to study or investigate events that are useful as a solution to delay claims and have the potential to be used in litigation. This research has been conducted to maximize reliable data sources. The Source Validation Protocol guides the process for ensuring the validity of the source data based on the Forensic Schedule Analysis methodology. According to the Critical Path Method (CPM) schedule analysis, the construction time of the Rusunawa Building (Rent Simple Flat) of the Health Polytechnic of the Ministry of Health Yogyakarta is 73.2 weeks or 511 calendar days. The 2 data source validation protocols, including Validation of Baseline Schedule Selection, Validation and Rectification, and Validation of As-Built Schedule Sources, Reconstruction, and Validation, greatly influenced the project delays.

Keywords