Monitoring of Slopes and Retaining Structures Related to Infrastructures Case Study Hydroelectric Power Plant Jiu River Livezeni Romania
Abstract
The Paper presents the results, interpretation and intervention measures obtained from inclinometer monitoring performed for a retaining structure built for the accomplishment of a hydrotechnical structure on Jiu River. The accomplishment of the hydrotechnical structure on Jiu River required a retaining structure of approximately 100m length adjacent to the slope which is crossed by the railway line Tg. Jiu - Simeria. The retaining structure made of 1500mm piles also keeps in safe condition the adjacent E79 Road section.
Keywords