环境与职业医学 (Apr 2024)
Assessment of intervention measures on trihalomethane in finished water by interrupted time series analysis
Abstract
BackgroundThe Qingcaosha Reservoir is facing issues of algal blooms and eutrophication, and the resulting increase in the level of chlorination disinfection by-products in the water has been a major concern. ObjectiveTo evaluate the impact of "Algae Monitoring and Control Program in Qingcaosha Reservoir" (hereinafter referred to as the program) on the control of trihalomethanes (THMs) in conventional finished water. MethodsFrom 2011 to 2019, water samples were collected from the Lujiazui Water Plant once per season, one sample each time, and the concentrations of four THMs (trichloromethane, dichlorobromomethane, monochlorodibromomethane, and tribromomethane) were measured in the samples. Using 2014 when the program was implemented as a cut-off point, the entire study period was divided into two phases: pre-implementation (2011–2013) and post-implementation(2014–2019). Segmented linear regression with interrupted time series analysis was applied to assess the concentrations and trends of THMs in the finished water before and after the program launch. ResultsThe concentration of total THMs in finished water increased by 1.561 µg·L−1 (P=0.010) for each season of time extension before launching the program. The change in the concentration of total THMs in finished water was not statistically significant after the program launch, but the THMs concentration showed a decreasing trend as the slope was −0.626 (P=0.001). From 2017 until the end of 2019, the average concentration of THMs in finished water of Lujiazui Water Plant dropped to 10 μg·L−1 or less.ConclusionsThe algae and eutrophication control measures in Qingcaosha Reservoir have achieved good results, controlling THMs in finished water at a low level, and the trend of THMs has changed from a yearly increase pattern before the program to a yearly decrease pattern after the program.
Keywords