Hemijska Industrija (Jan 2003)

White filler production plant "Alusil", Zvornik

  • Stanković Mirjana S.,
  • Pezo Lato L.,
  • Lazić Nada L.

DOI
https://doi.org/10.2298/HEMIND0302054S
Journal volume & issue
Vol. 57, no. 2
pp. 54 – 57

Abstract

Read online

Experts of the IGPC developed a white filler production technology in the laboratories, and then started production at the "Alusil", Zvornik complex. This plant was constructed in 1987 with a capacity of 20,000 t/y. The product meets all quality demands, as well as environmental regulations. There is no waste material in white fillers production, because all filtrates are kept in closed cycles. Production process is fully automatized, with minimal need for human intervention. The production process can be controlled manually, which is necessary during start - up, and repairs.

Keywords