Journal of Applied Mathematics (Jan 2014)

Single Machine Predictive Scheduling Using Inserted Idle Times

  • Hongli Zhu,
  • Hong Zhou

DOI
https://doi.org/10.1155/2014/304808
Journal volume & issue
Vol. 2014

Abstract

Read online

A single machine predictive scheduling problem is considered. The primary objective is to minimize the total completion times. The predictability of the schedule is measured by the completion time deviations between the predictive schedule and realized schedule. The surrogate measure of predictability is chosen to evaluate the completion time deviations. Both of the primary objective and predictability are optimized. In order to absorb the effects of disruptions, the predictive schedule is generated by inserting idle times. Right-shift rescheduling method is used as the rescheduling strategy. Three methods are designed to construct predictive schedules. The computational experiments show that these algorithms provide high predictability with minor sacrifices in shop performance.