Nuclear Engineering and Technology (Feb 2023)

A new proposal for controlled recycling of decommissioning concrete waste as part of engineered barriers of a radioactive waste repository and related comprehensive safety assessment

  • In Gyu Chang,
  • Jae Hak Cheong

Journal volume & issue
Vol. 55, no. 2
pp. 530 – 545

Abstract

Read online

As an alternative to conventional management options for a lot of concrete waste from decommissioning of nuclear power plants, a set of scenarios for controlled recycling of decommissioning concrete waste as engineered barriers of a radioactive waste repository was proposed, and a comprehensive safety assessment model and framework covering both pre-and post-closure phases was newly developed. The new methodology was applied to a reference vault-type repository, and the ratios of derived concentration limits to unconditional clearance levels of eighteen radionuclides for controlled recycling were provided for three sets of dose criteria (0.01, 1, and 20 mSv/y for the pre-closure and 0.01 mSv/y for the post-closure phases). It turns out that decommissioning concrete waste whose concentration is much higher than the unconditional clearance level can be recycled even when the dose criterion 0.01 mSv/y is applied. Moreover, a case study on ABWR bio-shield shows that the fraction of recyclable concrete waste increases significantly by increasing the dose criterion for the radiation worker in the pre-closure phase or the duration of storage prior to recycling. The results of this study are expected to contribute to demonstrating the feasibility of controlled recycling of a lot of decommissioning concrete waste within nuclear sectors.

Keywords