Field Actions Science Reports (Oct 2016)

Solar Power Integration on the Seychelles Islands

  • Tom Brown,
  • Thomas Ackermann,
  • Nis Martensen

Abstract

Read online

The Seychelles aim to cover 5% of electricity with renewables by 2020 and 15% by 2030. The local power system operator commissioned a Grid Absorption Study to determine the technical limits for reaching these targets. The study focussed on how much photovoltaic (PV) generation the grid can absorb. As result, the primary bottleneck was found to be the maintenance of backup generation reserves to compensate for fast down-ramping of PV generation.