Proceedings of the Mongolian Academy of Sciences (Feb 2016)
ТАЙШИРЫН УСАН ЦАХИЛГААН СТАНЦТАЙ ХОСЛОН АЖИЛЛАХ НАРНЫ ЦАХИЛГААН СТАНЦЫН СУДАЛГАА
Abstract
This paper presents study and results of 10 MW Solar PV plant that will be work with Taishir hydropower plant (as a hybrid system) in Mongolian West region.
Keywords